Sign In | Join Free | My infospaceinc.com
China Beijing Silk Road Enterprise Management Services Co., Ltd. logo
Beijing Silk Road Enterprise Management Services Co., Ltd.
Beijing Silk Road Enterprise Management Services Co.,Ltd.
Verified Supplier

1 Years

Home > Ceramic Capacitors >

ceramic disc capacitors Cornell Dubilier Electronics GP322 with long lead wires and conformal coating

Beijing Silk Road Enterprise Management Services Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

ceramic disc capacitors Cornell Dubilier Electronics GP322 with long lead wires and conformal coating

Voltage Rating : 1kV

Capacitance : 220pF

Temperature Coefficient : Y5P

Tolerance : ±10%

Pin Spacing : 6.4mm

Description : 1kV 220pF Y5P ±10% Ceramic Capacitors RoHS

Mfr. Part # : GP322

Model Number : GP322

Contact Now

Product Overview

Type G general purpose disc ceramic capacitors are designed for low-cost, small-size applications requiring low to high DC voltage. They are suitable for general purpose, coupling, by-pass, and filtering applications. Key advantages include a small size, conformal coating, radial leads, and long leads.

Product Attributes

  • Brand: CDE Cornell Dubilier
  • Certifications: Complies with the EU Directive 2002/95/EC (RoHS Compliant)
  • Material: Ceramic Disc
  • Coating: Conformal Coating
  • Lead Material: Tinned copper wire (Minimum lead content: 5%)

Technical Specifications

TypeCapacitance RangeVoltage RangeToleranceOperating Temperature RangeInsulation ResistanceDissipation FactorBreakdown VoltageLead LengthSize (Inches) DSize (Inches) TSize (Inches) SSize (mm) d
GE5 pF to 22,000 pF50, 100, 500 Vdc5%, 10%, 20%-30 C to +85 C10,000 M minimum2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz2.5 x rated voltage for 5 seconds maximum1.0 inch minimum0.118 to 0.4720.118 to 0.1570.098 to 0.3742.5 to 9.5
GH2,200 pF100 Vdc20%-30 C to +85 C10,000 M minimum4% @ 1kHz (Y5U)2.5 x rated voltage for 5 seconds maximum1.0 inch minimum0.2360.1180.2526.0
GM1,000 pF to 22,000 pF500 Vdc10%, 20%, -20+80%-30 C to +85 C10,000 M minimum2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz2.5 x rated voltage for 5 seconds maximum1.0 inch minimum0.157 to 0.6420.1570.250 to 0.3744.0 to 9.5
GP470 pF to 22,000 pF1000 Vdc10%, 20%-30 C to +85 C10,000 M minimum2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz2.5 x rated voltage for 5 seconds maximum1.0 inch minimum0.177 to 0.7480.1770.252 to 0.3744.5 to 9.5

2411272327_Cornell-Dubilier-Electronics-GP322_C19566439.pdf


Quality ceramic disc capacitors Cornell Dubilier Electronics GP322 with long lead wires and conformal coating for sale

ceramic disc capacitors Cornell Dubilier Electronics GP322 with long lead wires and conformal coating Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Beijing Silk Road Enterprise Management Services Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)